Potable water and civil mains

Our experience working on potable water and civil mains extends to installation of 225mm fire main and 180mm potable water main to a new-build hospital including installation of fire hydrants and non-return valves.

Balnakeilly Estates

The project included the excavation and installation of an underground water storage tank, gravity-fed potable water supply pipe, water meters and stop cocks to houses within the estate grounds. The underground tank includes a submersible booster pump, drain pipe work and automatic flushing filtration system with ultraviolet filters located in each of the house inlet supplies. The tank and potable pipe work were chlorinated in accordance with water board regulations before use.

Hospital Water and Fire Main

We supported the main contractor in installing a 225mm fire main and 180mm potable water main to this new-build hospital. We were responsible for the jointing and connection of both fire main and water main pipes including the installation of fire hydrants, air, non return and isolation (AVK) valves, construction of manifolds to accommodate water meters and drain/flush valves at locations for water board connections to the mains supply. The pipe work was trenched in and bedded with sand material and wa

Keabog Mill Steadings

This project included the excavation and installation of two underground water storage tanks located at each end of the potable water supply pipe run. The pipe run included 800 meters of gravity fed potable water supply pipe to the lower storage tank which fed a booster pump set. The booster pumping set delivered the required water on demand through individual water meters and stop cocks to 4 x renovated and converted properties. The tanks and potable pipe work were chlorinated in accordance with water

Auchterarder Water Supply

Here we excavated and installed a replacement underground water storage tank and 300 meters of potable water supply pipe work. These works were carried out to replace the collapsed and contaminated existing storage tank and silted up supply pipe work. The tank and potable pipe work were chlorinated in accordance with water board regulations before use.

« back to all projects